Showing posts with label painting. Show all posts
Showing posts with label painting. Show all posts

Friday, June 19, 2015

Capital priority projects for FY15

This list is not exhaustive and does not include MSBA projects; this is from admin responses to items involving the budget.

  • Jacob Hiatt roof top units (this is their HVAC system, which was already supposed to be done, that you might remembering my mentioning at our last meeting. We've had a holdup in the crediting of reimbursement)
  • Worcester Tech compressors (two of them)
  • Boiler replacements for the Taylor Building, Foley Stadium, Mill Swan (none of which are MSBA eligible because of not having students in the buildings) and West Tatnuck (where the boiler broke after this winter and must be replaced before fall).
  • Tatnuck Magnet wall replacement (outside)
  • Parent Information Center paint trim (the PIC is made of brick but has wooden gingerbread trim)
  • Jacob Hiatt front plaza and side stairs (stonework)
  • Lake View wall replacement (outside) 

Thursday, June 16, 2011

FY12 budget hearing: publishing as I go

sorry, we had a squirrelly wifi connection there
Keep hitting "refresh" as I'll post these as we go

we've received a letter from the state ethics commission that WPS should stop all fundraising activities (due to WEDF fundraising activities), pending legal advice...posted around athletics fundraising

considering community schools on an annual basis and evaluating placement and funding on an annual basis